首页> 外文期刊>Journal of Construction Engineering and Management >Contract Administration Guidelines for Public Infrastructure Projects in the United States and Saudi Arabia: Comparative Analysis Approach
【24h】

Contract Administration Guidelines for Public Infrastructure Projects in the United States and Saudi Arabia: Comparative Analysis Approach

机译:美国和沙特阿拉伯公共基础设施项目的合同管理指南:比较分析方法

获取原文
获取原文并翻译 | 示例
           

摘要

International construction, where contractors perform works in foreign countries, poses cultural and contractual risks resulting from the dissimilarities in social and legal outlooks. One of the major risks that leads to disputes in such international projects is poor contract administration. Research has been focused toward the cultural risks and ex-post dispute resolution in international construction, missing the important ex-ante dispute avoidance aspect. This paper addresses this knowledge gap with a special focus on the Kingdom of Saudi Arabia (KSA), which is the largest economy in the Middle East and North Africa. The paper does so by providing in-depthyet practicalcontract administration guidelines for U.S. contractors working in public works projects in KSA. The focus was put on KSA because of its economic strength and because KSA's associated contractual risks are uniquely relevant to those of other countries. To this end, the authors conducted comparative analysis between the Saudi Public Works Contract (PWC) and the U.S. Federal Acquisition Regulation (FAR) with respect to change orders, extension of time, liquidated damages, differing site conditions, and dispute resolution. Through exhibiting the important contractual and legal considerations that are unique to KSA, the outcomes of this research include: (1)a comparative checklist showing the similarities and differences between the two governmental approaches; and (2)a matrix of relative opportunities and risks of the PWC and FAR. Such an approach of analyzing the Saudi contracting environment from a U.S.-based context has not been undertaken before. As such, the study is beneficial to the U.S. contractor as it facilitates the understanding of the contractual premises in KSA and the associated risks and opportunities. This enhanced understanding will not only improve performance and minimize risks but also promote the contractor's strategic presence in the global market.
机译:承包商在国外进行工程的国际建筑会因社会和法律观点的差异而造成文化和合同风险。在此类国际项目中引起争议的主要风险之一是合同管理不善。研究一直侧重于国际建设中的文化风险和事后解决纠纷,而缺少事前避免纠纷的重要方面。本文针对这一知识差距,特别关注沙特阿拉伯王国(KSA),该国是中东和北非最大的经济体。本文是通过为在KSA中从事公共工程项目的美国承包商提供深入的实践合同管理指南来实现的。由于KSA具有强大的经济实力,并且因为KSA的相关合同风险与其他国家/地区具有独特的相关性,因此将重点放在KSA上。为此,作者在沙特公共工程合同(PWC)和美国联邦采购法规(FAR)之间进行了变更分析,变更单,时间延长,违约赔偿金,不同的工地条件以及争议解决方面的比较分析。通过展示KSA独有的重要合同和法律考虑,这项研究的结果包括:(1)比较清单,显示两种政府方法之间的异同; (2)PWC和FAR的相对机会和风险矩阵。以前从未采用过这种在美国范围内分析沙特合同环境的方法。因此,这项研究对美国承包商有利,因为它有助于了解KSA中的合同前提以及相关的风险和机会。这种加深的了解将不仅可以改善性能并最大程度地降低风险,而且可以促进承包商在全球市场上的战略地位。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号