Developing a Novel Framework to Manage Schedule Contingency Using Theory of Constraints and Earned Schedule Method

机译:使用约束理论和挣进度表法开发一种新的框架来管理进度表应变

获取原文
获取原文并翻译 | 示例
       

摘要

In this paper, a novel framework is presented for estimating, allocating, and managing schedule contingency using the theory of constraints and the earned schedule technique. The main aim of the proposed framework is to present a practical technique to manage schedule contingency in a manner that is easy to use and simple to understand; can overcome the drawbacks of earned value management for the schedule component; can overcome the inaccuracy caused by using critical path method; and takes into account the statistical nature of each activity and merges them to form a single framework. The framework introduces two new measures, buffer performance index and buffer variance, for measuring the expected remaining buffer and the actual remaining buffer on critical and noncritical chains based on the percentage completion for each activity at the end of the reporting period, respectively. To verify the proposed framework, the processes and measures have been applied to three projects, each with different complexities. The results show potential for managing buffers when placed at the project level, without the involvement of complex mathematical models or tedious equations.
机译:在本文中,提出了一种新颖的框架,该框架使用约束理论和挣得的进度技术来估计,分配和管理进度意外情况。所提出的框架的主要目的是提出一种实用的技术,以易于使用和易于理解的方式来管理进度应急。可以克服进度表组件的挣值管理的缺点;可以克服由于采用关键路径法造成的误差。并考虑到每个活动的统计性质,并将其合并为一个单一的框架。该框架引入了两个新的指标,即缓冲区性能指标和缓冲区差异,用于分别根据报告期末每个活动的完成百分比来衡量关键链和非关键链上的预期剩余缓冲区和实际剩余缓冲区。为了验证提议的框架,已将流程和措施应用于三个项目,每个项目的复杂性不同。结果表明,在项目级别放置缓冲区时,无需复杂的数学模型或繁琐的方程式就可以管理缓冲区。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号