Delays are among the most common phenomena in the construction industry. During the last three decades delays have occurred in most types of projects, from simple Building projects to the most complex projects such as nuclear power plants or tunneling Works. Generally, delays may be caused by: the client (compensable delays); the contractors (non-excusable delays); or acts of God or a third party (excusable delays). This paper classifies the main causes of non-excusable delays according to the source of occurrence, then identifies the factors contributing to those causes.
机译:延误是建筑行业中最常见的现象。在过去的三十年中,从简单的建筑项目到最复杂的项目(如核电站或隧道工程),大多数类型的项目都出现了延误。通常,延迟可能是由以下原因引起的:客户端(可补偿的延迟);承包商(不可原谅的延误);或上帝或第三方的行为(可原谅的延迟)。本文根据发生的原因对不可原谅的延误的主要原因进行了分类,然后确定了造成这些原因的因素。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号