Computer Vision-Based Disruption Management for Prefabricated Building Construction Schedule

机译:基于计算机视觉建筑施工时间表的中断管理

获取原文
获取原文并翻译 | 示例
           

摘要

Prefabricated building construction (PBC) projects are prone to schedule delays and budget overruns due to disruptions. Hence it is necessary to timely detect and evaluate disruptions and respond in order to put a disrupted construction project back on track. This study focused on computer vision-based (CVB) disruption management for PBC schedules. First, real-time and nonintrusive detection of four types of disruptions on PBC jobsite was achieved using CVB technology. Second, the detected disruptions of the PBC schedule were evaluated by quantifying their impacts on the project. Third, repair of the disrupted schedule was achieved based on the principle of disruption management by developing an optimization model with the objectives of minimizing the repair cost and deviation from the original schedule. The proposed disruption management system was illustrated and justified through a field application. This study is expected to provide a digital methodology to achieve digital disruption management for the PBC schedule.
机译:预制建筑建筑(PBC)项目易于根据中断安排延误和预算超支。因此,有必要及时检测和评估中断并响应,以便将中断的建筑项目重新追溯到轨道上。本研究专注于PBC计划的基于计算机视觉(CVB)中断管理。首先,使用CVB技术实现了对PBC乔布捷的四种类型的实时和非识别检测。其次,通过量化其对项目的影响来评估检测到的PBC计划中断。第三,通过开发优化模型,根据中断管理原则来实现中断的时间表的修复,以最小化修复成本和原始时间表的偏差目标。拟议的中断管理制度通过现场申请说明和证明。该研究预计提供了一种数字方法,以实现PBC计划的数字中断管理。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号