首页> 外文期刊>The Journal of Canadian Petroleum Technology >History Match Of The Utf Phasea Project With Coupled Reservoir geomechanical Simulation
【24h】

History Match Of The Utf Phasea Project With Coupled Reservoir geomechanical Simulation

机译:Utf Phasea项目与储层地质力学模拟的历史匹配

获取原文
获取原文并翻译 | 示例
       

摘要

Field operation of the Underground Test Facility (UTF) Phase A SAGD project started in November 1987 and terminated in October 1990. In order to understand the interactions between fluid flow and geomechanical behaviour of the reservoir during the SAGD operation, the coupled reservoir geomechanical simulation methodology was applied to history match the measured performance of the project. Reservoir and geomechanical responses were available from an extensive instrumentation program designed for this project. Reservoir pressure, temperature, horizontal displacement, vertical strain and volumetric strain from the coupled simulation were compared with the data obtained from the field survey. These comparisons show that the coupled reservoir geomechanical simulation methodology has the potential to capture both reservoir and geomechanical responses during SAGD. In addition, the steam chamber propagation modes, both in the field and in the simulation, were also discussed.
机译:地下测试设施(UTF)A阶段SAGD项目的现场运行始于1987年11月,并于1990年10月终止。为了了解SAGD运行期间流体流动与储层地质力学行为之间的相互作用,采用了耦合储层地质力学模拟方法被应用到历史匹配项目的实测绩效。可为该项目设计的广泛的仪器程序可提供储层和岩土力学响应。将耦合模拟中的储层压力,温度,水平位移,垂直应变和体积应变与现场调查获得的数据进行了比较。这些比较表明,耦合的储层岩土力学模拟方法具有捕获SAGD期间储层和岩土力学响应的潜力。另外,还讨论了蒸汽室在现场和模拟中的传播模式。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号