首页> 外文期刊>Journal of bridge engineering >ERECTION OF CABLE-STAYED BRIDGES HAVING COMPOSITE DECKS WITH PRECAST CONCRETE SLABS
【24h】

ERECTION OF CABLE-STAYED BRIDGES HAVING COMPOSITE DECKS WITH PRECAST CONCRETE SLABS

机译:带有预制混凝土板的带有复合甲板的斜拉桥架设

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

For the construction of composite steel-concrete decks of cable-stayed bridges, methods of erection and analysis have to be applied that, upon completion of the deck, accurately yield the prescribed dead load configuration of the deck regarding geometry and forces. During deck erection, no unwanted bending moments should be locked into the composite sections when the concrete slab is connected to the steel substructure. Such locked-in moments would bend the deck, cause concrete creep that is difficult to predict, and introduce the risk of deviations from the desired deck alignment and the corresponding distribution of forces.
机译:对于斜拉桥的复合钢混凝土面板的建造,必须采用安装和分析方法,在完成甲板后,可准确得出有关几何形状和力的规定的甲板静载构型。在混凝土板连接到钢结构上时,在甲板安装期间,不应将不必要的弯矩锁定在复合材料段中。这样的锁定力矩将使甲板弯曲,导致混凝土蠕变难以预测,并带来偏离期望的甲板对准和相应的力分布的风险。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号