...
首页> 外文期刊>Journal of bridge engineering >Proposed Method for Determining the Interval for Hands-on Inspection of Steel Bridges with Fracture Critical Members
【24h】

Proposed Method for Determining the Interval for Hands-on Inspection of Steel Bridges with Fracture Critical Members

机译:确定具有断裂关键构件的钢桥动手检查间隔的建议方法

获取原文
获取原文并翻译 | 示例
           

摘要

The proposed assessment procedure presented in this paper may be used to establish inspection intervals for steel bridges with fracture critical members (FCMs) (if adopted by the Federal Highway Administration). The procedure proposed herein only applies to FCM inspections which are defined as follows: a hands-on inspection of a FCM or member components that may include visual and other nondestructive evaluations. The method is rather simple and provides an alternative procedure to the pure calendar based inspection methodology currently specified in the Code of Federal Regulations for all FCMs. There are only two requirements which must first be satisfied in order to use the assessment. The first is that the routine 24-month inspection must continue to be performed on the bridge under evaluation. The second is that a FCM inspection must be performed on the bridge or the FCM under evaluation prior to the implementation of the resulting inspection intervals given from this assessment. The "initial inspection" should be performed as a typical FCM inspection. The assessment procedure is intended to be applied to individual FCMs and not the entire bridge itself. However, on bridges with multiple FCMs, the "worst case" FCM may be evaluated using the assessment and the resulting inspection interval may be applied to all FCMs on the bridge (for simplicity and bookkeeping purposes). The decision of whether to apply the assessment to all FCMs or the bridge's worst case FCM is left up to the owner or engineer. The approach is not based on more rigorous damage tolerant design concepts or other fracture mechanics based methods. Nevertheless, the method is a first step in providing a more rational alternative to calendar based inspection and allows owners to prioritize structures and resource allocation. Using engineering experience and judgment, the interval for the hands-on inspection of steel bridges with FCMs can then be selected based on upper limits established through a consensus. Although the focus is on fracture critical bridges and members, the writers believe that the concept could be extended to a variety of structure types and configurations.
机译:本文提出的评估程序可用于确定具有断裂关键构件(FCM)的钢桥的检查间隔(如果联邦公路管理局采用)。本文提出的程序仅适用于定义如下的FCM检查:FCM或可能包括视觉和其他非破坏性评估的成员组件的动手检查。该方法相当简单,并且为所有FCM现行的《联邦法规》中规定的基于纯日历的检查方法提供了替代程序。为了使用评估,必须首先满足两个要求。首先是必须继续对评估中的桥梁进行例行的24个月例行检查。第二个原因是,在实施评估得出的最终检查间隔之前,必须对被评估的桥梁或FCM进行FCM检查。 “初始检查”应作为典型的FCM检查执行。评估程序旨在应用于单个FCM,而不是整个桥梁本身。但是,在具有多个FCM的桥梁上,可以使用评估来评估“最坏情况” FCM,并且可以将得出的检查间隔应用于桥梁上的所有FCM(为简便起见和记账目的)。是否将评估应用于所有FCM或桥梁的最坏情况FCM的决定由所有者或工程师决定。该方法不是基于更严格的抗损伤设计概念或其他基于断裂力学的方法。尽管如此,该方法是为基于日历的检查提供更合理替代方案的第一步,并允许所有者优先考虑结构和资源分配。利用工程经验和判断力,可以根据通过共识确定的上限,选择使用FCM进行钢桥动手检查的时间间隔。尽管重点放在断裂关键的桥梁和构件上,但作者认为该概念可以扩展到各种结构类型和构造。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号