...
首页> 外文期刊>Journal of bridge engineering >Time-Variant Risk Assessment of Bridges with Partially and Fully Closed Lanes due to Traffic Loading and Scour
【24h】

Time-Variant Risk Assessment of Bridges with Partially and Fully Closed Lanes due to Traffic Loading and Scour

机译:交通荷载和冲刷导致部分和完全封闭车道的桥梁的时变风险评估

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

This article presents an approach for assessing time-variant risk associated with the closure of bridge lanes due to traffic loading and scour. Scenarios of lane closure are identified for both traffic loading and scour. The time-variant failure probabilities of girders under traffic loading are evaluated using a deterioration model that accounts for the decrease in resistance and a live-load model that considers the increase in maximum load effects. The annual failure probabilities of pier columns due to scour are estimated by comparing pier depth and scour depth caused by the annual peak flow. The probabilities of occurrence of the identified closure scenarios are computed on the basis of the relations between these scenarios and the failure events of girders and pier columns, and the correlations among failure modes are considered. The consequences caused by the lane-closure scenarios are evaluated by considering repair, running, and time-loss costs. Finally, the time-variant risks associated with the identified scenarios are assessed. The proposed approach is illustrated using a highway bridge as an example. (C) 2016 American Society of Civil Engineers.
机译:本文提出了一种方法,用于评估与因交通负荷和冲刷而封闭桥梁车道相关的时变风险。针对交通负荷和冲刷情况,确定了封闭车道的方案。使用考虑了阻力降低的退化模型和考虑最大负载效应增加的活载模型,评估了交通荷载下大梁的时变失效概率。通过比较冲孔深度和年峰值流量引起的冲孔深度,估算冲孔引起的墩柱的年失效概率。根据这些情景与大梁和墩柱的破坏事件之间的关系,计算出确定的封闭情景的发生概率,并考虑破坏模式之间的相关性。通过考虑维修,运行和时间损失成本来评估车道关闭场景所导致的后果。最后,评估与确定的场景相关的时变风险。以公路桥梁为例说明了所提出的方法。 (C)2016年美国土木工程师学会。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号