Causes of Delay in the Planning and Design Phases for Construction Projects

机译:建设项目规划设计阶段延误的原因

获取原文
获取原文并翻译 | 示例
       

摘要

Problems of delay occur in all phases of construction projects. While most previous studies have focused on finding causes or overcoming delays in the construction phase, few studies have analyzed delay problems in the planning and design phases. The main purpose of this study is to identify and rank delay causes in the planning and design phases. A structured questionnaire was sent to engineers at the A/E companies for public construction projects in Taiwan. Based on 95 valid responses, this study identified the delay causes and analyzed the importance and frequency of delays using the relative importance index. Analytical results reveal that "changes in client's requirement" are the main causes of delays in both planning and design phases. The finding is good justification for many public clients who usually change their requirements during the planning and design phases that really delay construction projects.
机译:延迟问题在建设项目的各个阶段都会出现。尽管以前的大多数研究都集中在寻找施工阶段的原因或克服延迟,但很少有研究在规划和设计阶段分析延迟问题。这项研究的主要目的是在计划和设计阶段确定延迟原因并对其进行排名。针对台湾公共建设项目,向A / E公司的工程师发送了一份结构化问卷。基于95个有效响应,本研究确定了延迟原因,并使用相对重要性指数分析了延迟的重要性和频率。分析结果表明,“客户需求的变化”是计划和设计阶段延迟的主要原因。对于许多通常在规划和设计阶段改变需求的公共客户来说,这一发现是一个很好的理由。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号