首页> 外文期刊>Journal of applied statistics >0obustness of the EWMA and the combined X-EWMA control charts with variable sampling intervals to non-normality
【24h】

0obustness of the EWMA and the combined X-EWMA control charts with variable sampling intervals to non-normality

机译:0 EWMA和组合X-EWMA控制图的健壮性,采样间隔可变至非正常

获取原文
获取原文并翻译 | 示例
       

摘要

The exponentially weighted moving average (EWMA) control charts with variable sampling intervals (VSIs) have been shown to be substantially quicker than the fixed sampling intervals (FSI) EWMA control charts in detecting process mean shifts. The usual assumption for designing a control chart is that the data or measurements are normally distributed. However, this assumption may not be true for some processes. In the present paper, the performances of the EWMA and combined X-EWMA control charts with VSIs arc evaluated under non-normality. It is shown that adding the VS1 feature to the EWMA control charts results in very substantial decreases in the expected time to detect shifts in process mean under both normality and non-normality. However, the combined X-EWMA chart has its false alarm rate and its detection ability is affected if the process data are not normally distributed.
机译:具有可变采样间隔(VSI)的指数加权移动平均(EWMA)控制图在检测过程均值偏移方面比固定采样间隔(FSI)EWMA控制图要快得多。设计控制图的通常假设是数据或测量值呈正态分布。但是,此假设可能不适用于某些过程。在本文中,在非正态下评估了EWMA和结合了VSI的X-EWMA控制图的性能。结果表明,将VS1功能部件添加到EWMA控制图中会导致在正常和非正常状态下检测过程平均值变化的预期时间大大减少。但是,如果过程数据不是正态分布的,则组合的X-EWMA图具有误报率,并且其检测能力也会受到影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号