首页> 外文期刊>Joint Commission Journal on Quality and Patient Safety >Using Project Management Methodology to Plan and Track Inpatient Care
【24h】

Using Project Management Methodology to Plan and Track Inpatient Care

机译:使用项目管理方法来计划和跟踪住院治疗

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Background: Effective care of each patient through-out a hospital admission involves executing a specific set of tasks to produce a favorable outcome within an appropriate time frame. The ProjectRounds™ method-ology, which can be implemented using widely available software, incorporates the principles of project man-agement in planning and control hospital inpatient care. It consists of four stages—clinical assessment, plan-ning, scheduling, and tracking. Overview of ProjectRounds and Example: As an exam-ple, a 68-year-old-man is admitted with pneumonia. In clinical assessment, the admitting physician uses an assessment tool that prompts her to list all the patient''s clinical issues, define the conditions that need to be met to discharge the patient, highlight special problems, and list any consultations, diagnostic tests, and procedures that are planned. In planning, the work breakdown structure—a tabulation of all the tasks in the "project" (the admission)—is created. In scheduling, a project schedule is generated, and in tracking, the clinical team evaluates and monitors the project''s course. During interdisciplinary clinical rounds, the progress of the patient''s hospital care can be tracked and quantified by employing the percent complete method. Tracking can be used as a "dashboard," providing a concise summary of the care that needs to be and has been rendered to the patient. Summary and Next Steps: Applying the tenets of project management can optimize the process of providing health care to hospital inpatients.
机译:背景:在住院期间对每位患者进行有效护理涉及执行一组特定任务,以在适当的时间范围内产生良好的结果。可以使用广泛使用的软件来实施ProjectRounds™方法论,该方法论将项目管理原则纳入了计划和控制医院的住院治疗。它包括四个阶段-临床评估,计划制定,计划和跟踪。 ProjectRound的概述和示例:例如,一名68岁的男子因肺炎而入院。在临床评估中,主治医师使用评估工具来提示她列出所有患者的临床问题,定义出院患者所需满足的条件,突出特殊问题并列出任何咨询,诊断测试,和计划的程序。在计划中,将创建工作分解结构(“项目”中所有任务的列表(准入))。在计划中,将生成项目进度表,在跟踪中,临床团队将评估并监视项目的过程。在跨学科临床轮次中,可以通过采用百分比完成法来跟踪和量化患者的医院护理进度。跟踪可用作“仪表板”,提供需要和已经提供给患者的护理的简要摘要。总结和后续步骤:应用项目管理的原则可以优化向住院患者提供医疗保健的过程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号