...
首页> 外文期刊>Jane's navy international >Carrier Ford completes Combat Systems Ship's Qualification Trials
【24h】

Carrier Ford completes Combat Systems Ship's Qualification Trials

机译:承运人福特完成了战斗系统船舶的资格试验

获取原文
获取原文并翻译 | 示例
           

摘要

The US Navy (USN) aircraft carrier USS Gerald R Ford(CVN 78) and its crew have completed Combat Systems Ship's Qualification Trials (CSSQT), the service confirmed on 24 April. CSSQT is the culminating combat systems test for first-of-class Ford's 18 month post-delivery test and trials (PDT&T) phase of operations. Following PDT&T, Ford will start final preparations for Full-Ship Shock Trials (FSST), which are scheduled to occur by the end of the third quarter, according to USN officials. The FSST will validate Ford's ability to carry out assigned missions and evaluate operational survivability after exposure to an underwater shock. CSSQT commenced in February, ran the ship through five phases of testing, and ended with the final 2C phase on 17 April. CSSQT's completion represents "a major milestone in validating the ship's capability to defend itself and the crew," USN officials noted.
机译:美国海军(USN)航空母舰USS Gerald R FORD(CVN 78)及其船员已完成战斗系统船舶的资格试验(CSSQT),该服务于4月24日确认。 CSSQT是一级福特18个月后交付后测试和试验(PDT&T)业务阶段的最终战斗系统测试。 据USN官员称,遵循PDT&T,福特将开始为全船冲击试验(FSST)进行全船冲击试验(FSST)的最终准备,该款项计划发生在第三季度末。 FSST将验证福特在暴露于水下休克后进行指定的任务并评估运营生存能力。 CSSQT于二月开始,通过五个阶段进行船舶进行测试,并于4月17日以最终的2C阶段结束。 CSSQT的完成代表了“验证船舶捍卫自己和船员的主要里程碑”,“USN官员指出。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号