首页> 外文期刊>ITE Journal >Predicting the 24-Hour Delay at Signalized Intersections
【24h】

Predicting the 24-Hour Delay at Signalized Intersections

机译:预测信号交叉口的24小时延迟

获取原文
获取原文并翻译 | 示例
       

摘要

The Washington State Department of Transportation (WSDOT), as well as transportation authorities throughout the United States, is under increasing pressure to make the most effective use possible of transportation funds. To address the limited funds available for new capacity improvements, the Washington State Legislature adopted a resolution mandating that highway improvement funds be spent equitably. Responding to this, WSDOT has developed a statewide cost-benefit method for prioritizing new capacity improvement projects.
机译:华盛顿州交通运输部(WSDOT)以及美国各地的交通管理部门承受着越来越大的压力,要求最有效地利用交通运输资金。为了解决可用于新容量提升的有限资金,华盛顿州立法机关通过了一项决议,要求公平地使用高速公路改善资金。对此,WSDOT开发了一种州范围内的成本效益方法,以优先考虑新的产能改进项目。

著录项

  • 来源
    《ITE Journal》 |1996年第9期|p.47-51|共5页
  • 作者

    KARL WESTBY; NANCY NIHAN;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 交通运输;
  • 关键词

  • 入库时间 2022-08-18 00:43:08

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号