首页> 外文期刊>International Water Power & Dam Construction >Voith completes hydro work in Austria, new order in Norway
【24h】

Voith completes hydro work in Austria, new order in Norway

机译:福伊特在奥地利完成水利工程,在挪威完成新订单

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Voith has announced it has recently received an order for a hydropower plant in Norway and also successfully concluded two hydropower projects in Austria. The order to equip Braskereidfoss power plant at the Glomma River in South Norway -the country's widest and longest inland waterway - is worth about EUR18M and constitutes a joint project by the Voith Hydro companies in Norway and Austria. Voith will deliver the complete generator-turbine unit with an output of 15.7MW including all automation systems. The new unit will be built directly alongside an existing power plant utilizing the existing infrastructure.
机译:福伊特已经宣布,它最近收到了挪威一家水力发电厂的订单,并且还成功完成了奥地利的两个水力发电项目。挪威南部最宽,最长的内河航道的Braskereidfoss发电厂的订单价值约1800万欧元,是福伊特水电在挪威和奥地利的公司的联合项目。福伊特将交付包括所有自动化系统在内的完整的发电机-涡轮机单元,输出功率为15.7MW。新机组将利用现有基础设施直接与现有发电厂一起建造。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号