Finding the optimal order of priority for dry port construction: case study in the North of Vietnam

机译:寻找干港建筑优先级的最佳顺序:越南北部的案例研究

获取原文
获取原文并翻译 | 示例
       

摘要

The development of the Vietnam dry port system is facing many difficulties, especially in matters of calling for investment as well as synchronisation in developing transport infrastructure, such as between rail systems and dry port networks. The purpose of this study is to apply multiple-criteria decision analysis (MCDA) to investigate the determinants in prior implementations of dry port construction, as well as find the order of priority for dry port construction in Northern Vietnam. The results indicate that the possibility of transportation cost reduction is the most important factor, followed by the accessibility to highway road infrastructure and to seaports. Phu Dong dry port is indicated as the first port that should be invested in, thanks to its superiority in terms of geography, its ability to connect with the means of transportation as well as other factors, followed by the dry ports of Huong Canh, Lang Son, and Cao Bang.
机译:越南干港系统的发展面临着许多困难,特别是在呼吁投资的事项以及在开发运输基础设施中同步,例如铁路系统和干港网络之间。本研究的目的是应用多标准决策分析(MCDA)来调查干港建设的现有实施中的决定因素,并找到越南北部干港建设的优先级顺序。结果表明,运输成本降低的可能性是最重要的因素,其次是公路道路基础设施的可行性和海港。 Phu Dong Derd Port被指示为应投资的第一港口,由于其在地理方面的优越性,其能够与运输工具以及其他因素连接,其次是郎沧港,郎儿子和曹爆。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号