A new LSM approach for planning repetitive housing projects

机译:用于规划重复性住房项目的新的LSM方法

获取原文
获取原文并翻译 | 示例
       

摘要

Different scheduling techniques are used in planning repetitive housing projects [Bar Charts, Network Based Methods (CPM), Line of Balance techniques (LOB) and Linear Scheduling methods (LSM)]. Majority of these planning and scheduling techniques are based on the logic of construction execution processes. These processes are not sufficient to obtain the optimum plan for the repetitive housing projects. In the current planning processes, the number of houses that can be constructed per cycle of repetition is determined either by the contract project duration or the available resources in general. This paper presents a new scheduling method for repetitive housing, based on linear scheduling. The formwork is considered as the key resource that controls the scheduling process. Analysis of the construction operation for any unit in the repetitive housing project reveals that concrete works represents the major construction operation either from the time or cost point of view.
机译:在规划重复性住房项目中使用了不同的调度技术[条形图,基于网络的方法(CPM),平衡线技术(LOB)和线性调度方法(LSM)]。这些计划和调度技术中的大多数都基于施工执行过程的逻辑。这些过程不足以为重复性住房项目获得最佳计划。在当前的计划流程中,每个重复周期可建造的房屋数量取决于合同项目的工期或总体上的可用资源。本文提出了一种基于线性调度的重复住房调度新方法。模板被视为控制计划过程的关键资源。对重复性住房项目中任何单元的施工操作进行分析后发现,从时间或成本角度来看,混凝土工程是主要的施工操作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号