首页> 外文期刊>International Journal of Project Management >Evaluation of stakeholder influence in the implementation of construction projects
【24h】

Evaluation of stakeholder influence in the implementation of construction projects

机译:利益相关者对建设项目实施的影响评估

获取原文
获取原文并翻译 | 示例
       

摘要

A negative attitude to a construction project by stakeholders can severely obstruct its implementation. Such obstruction will cause cost overruns and exceeded time schedules due to conflicts and controversies concerning project design and implementation. A case study consisting of two projects has been undertaken to investigate how the problems of managing the concerns of stakeholders present themselves in an actual construction project. A method of stakeholder mapping, together with the power/interest matrix, has been used to identify stakeholders and their influence on the projects studied. Which problems arose, how were they resolved, and what were the consequences of the solution? The case study shows that an evaluation of stakeholder demands and influence should be considered as a necessary and important step in the planning, implementation, and completion of any construction project.
机译:利益相关者对建设项目的消极态度会严重阻碍其实施。由于与项目设计和实施有关的冲突和争议,这种阻碍将导致成本超支和超出时间表。进行了一个由两个项目组成的案例研究,以调查在实际的建设项目中如何解决利益相关者的关注问题。利益相关者映射的一种方法以及力量/利益矩阵已被用于识别利益相关者及其对所研究项目的影响。出现了哪些问题,如何解决这些问题,以及解决方案的后果是什么?案例研究表明,在任何建设项目的计划,实施和完成中,对利益相关者的需求和影响的评估应被视为必要而重要的步骤。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号