Project Scheduling using Dependency Structure Matrix

机译:使用依赖结构矩阵的项目计划

获取原文
获取原文并翻译 | 示例
       

摘要

Dependency Structure Matrix (DSM) has been identified as a powerful tool to plan the activity sequences, identify and manage information exchanges. However, its application in scheduling is very limited. So far, DSM has been used to enable critical path calculations by assigning the 'amount of effort/work done' as duration to the activities. This paper addresses 'communication time', a new concept while estimating the normal project duration. The other issue arises, while planning and scheduling compressed projects with DSM. When the activities are overlapped to achieve the compressed duration, there arise two cases - the natural overlap (involving minimum risk) and the forced overlap (involves more risk). This paper focuses on the estimation of natural overlap project duration using DSM. Further, the author also proposes a detailed implementation procedure focusing on the above ideas and is illustrated through an example.
机译:依赖关系矩阵(DSM)被认为是计划活动序列,识别和管理信息交换的强大工具。但是,其在调度中的应用非常有限。到目前为止,通过将“工作量/完成的工作量”分配为活动的持续时间,DSM已用于启用关键路径计算。本文在估计正常项目工期的同时,提出了“通信时间”这一新概念。在使用DSM计划和计划压缩项目时会出现另一个问题。当活动重叠以达到压缩持续时间时,会出现两种情况-自然重叠(涉及最小风险)和强制重叠(涉及更多风险)。本文着重于使用DSM估算自然重叠项目工期。此外,作者还针对以上思想提出了详细的实现过程,并通过示例进行了说明。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号