首页> 外文期刊>International Journal of Production Research >Effective allocation of idle time in the group technology economic lot scheduling problem
【24h】

Effective allocation of idle time in the group technology economic lot scheduling problem

机译:组技术经济批调度问题中空闲时间的有效分配

获取原文
获取原文并翻译 | 示例
       

摘要

The group technology economic lot scheduling problem (GT-ELSP) addresses the issue of scheduling the products, classified into groups, on a single facility. The objective is to develop a schedule that minimises the sum of average inventory holding and setup costs over the infinite planning horizon. Previous research on this class of problems has assumed the cycle idle time to be equally divided among various sequence positions and has varied the frequency of production of individual products. We propose a heuristic that maintains constant frequency of products and varies the idle time among the sequence positions. We address the feasibility issue of the GT-ELSP and show that our heuristic, based on the time varying lot size approach, yields low-cost quality solutions that aid practical implementation. We tested our heuristic on a large set of randomly generated problems to assess its efficacy over the solutions of earlier proposed heuristics.
机译:小组技术经济批次计划问题(GT-ELSP)解决了在单个设施上计划分类成组的产品的问题。目的是制定时间表,以在无限的计划范围内将平均库存持有量和设置成本的总和最小化。关于此类问题的先前研究假设循环空闲时间在各个顺序位置之间平均分配,并且改变了单个产品的生产频率。我们提出了一种启发式方法,该方法可保持产品的恒定频率并在序列位置之间改变空闲时间。我们解决了GT-ELSP的可行性问题,并表明基于时变批量方法的启发式方法可提供有助于实际实施的低成本质量解决方案。我们在大量随机产生的问题上测试了启发式方法,以评估其在较早提出的启发式方法解决方案中的功效。

著录项

  • 来源
    《International Journal of Production Research》 |2011年第24期|p.7493-7513|共21页
  • 作者单位

    Department of Mechanical Engineering, Padre Conceicao College of Engineering, Verna,403 722, Goa, India;

    Department of Mechanical Engineering, National Institute of Technology Calicut, NIT Campus (PO), Calicut 673 601, Kerala, India;

    Department of Mechanical Engineering, National Institute of Technology Calicut, NIT Campus (PO), Calicut 673 601, Kerala, India;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    group technology; economic lot scheduling; heuristic;

    机译:组技术;经济批量计划;启发式;
  • 入库时间 2022-08-17 13:38:15

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号