首页> 外文期刊>International Journal of Production Research >The concurrent block layout problem
【24h】

The concurrent block layout problem

机译:并发块布局问题

获取原文
获取原文并翻译 | 示例
       

摘要

The interdependency of block layout and detail level work centre layout is discussed and used to motivate the problem of concurrent block layout planning. The concurrent perspective emphasises the simultaneous minimisation of materials handling cost between work centres and maximisation of activity relationships within work centres. The resultant bi-criteria problem is formulated and a series of test problems are generated. Simple Monte Carlo simulation is used to demonstrate how modelling tools applied to the traditional block layout problem could be adapted in the development of a new class of algorithms based on the concurrent perspective.
机译:讨论了块布局与详细级别工作中心布局的相互依赖关系,并将其用于激发并发块布局计划的问题。并发观点强调同时最小化工作中心之间的物料处理成本和最大化工作中心内的活动关系。公式化了由此产生的双准则问题,并生成了一系列测试问题。简单的蒙特卡洛仿真用于说明基于并发视角的新型算法开发中如何适应应用于传统块布局问题的建模工具。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号