首页> 外文期刊>International Journal of Production Research >On the beat of the drum: improving the flow shop performance of the Drum-Buffer-Rope scheduling mechanism
【24h】

On the beat of the drum: improving the flow shop performance of the Drum-Buffer-Rope scheduling mechanism

机译:在鼓的节奏上:提高Drum-Buffer-Rope调度机制的流水车间性能

获取原文
获取原文并翻译 | 示例
       

摘要

One of the main elements of the theory of constraints is its Drum-Buffer-Rope (DBR) scheduling (or release) mechanism that controls the release of jobs to the system. Jobs are not released directly to the shop floor - they are withheld in a backlog and released in accordance with the output rate of the bottleneck (i.e. the drum). The sequence in which jobs are considered for release from the backlog is determined by the schedule of the drum, which also determines in which order jobs are processed or dispatched on the shop floor. In the DBR literature, the focus is on the urgency of jobs and the same procedure is used both for backlog sequencing and dispatching. In this study, we explore the potential of using different combinations of rules for sequencing and dispatching to improve DBR performance. Based on controlled simulation experiments in a pure and general flow shop we demonstrate that, although the original procedure works well in a pure flow shop, it becomes dysfunctional in a general flow shop where job routings vary. Performance can be significantly enhanced by switching from a focus on urgency to a focus on the shortest bottleneck processing time during periods of high load.
机译:约束理论的主要元素之一是其Drum-Buffer-Rope(DBR)调度(或释放)机制,用于控制作业向系统的释放。作业不会直接释放到车间-积压下来并根据瓶颈(即鼓)的输出速度释放。考虑要从积压中释放作业的顺序由滚筒的时间表决定,该时间表还确定了要在车间中处理或分派作业的顺序。在DBR文献中,重点是工作的紧迫性,并且积压顺序和分派都使用相同的过程。在这项研究中,我们探索了使用不同的规则组合进行排序和调度以提高DBR性能的潜力。基于在纯流程车间和一般流程车间进行的受控模拟实验,我们证明,尽管原始过程在纯流程车间中效果很好,但在工作流程变化的普通流程车间中,它变得功能失调。通过在高负载期间从紧迫性切换到最短的瓶颈处理时间,可以显着提高性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号