首页> 外文期刊>International journal of multicriteria decision making >Decision aid for hydropower project prioritisation in Nepal by applying Visual PROMETHEE
【24h】

Decision aid for hydropower project prioritisation in Nepal by applying Visual PROMETHEE

机译:使用Visual PROMETHEE为尼泊尔水电项目优先级提供决策帮助

获取原文
获取原文并翻译 | 示例
       

摘要

Nepal needs appropriate decision framework for exploring huge hydropower potential, This work primarily proposes a decision framework applicable to small hydropower schemes (1 to 25 MW) to assist in prioritisation. In the future a similar approach could be developed to prioritise hydropower projects across a broad capacity range. This paper, based on a multi-criteria approach, has the main objective to develop a decision support tool to evaluate, compare and rank alternative proposals of hydropower schemes. The proposed framework organised wide range of criteria under five goals referring to economic, social, environmental, political objectives and additionally, their inherent uncertainties. Six Nepalese pilot sites with comparable capacity were identified for testing the decision framework and Visual PROMETHEE (VP) application proved to be effective for decision making. Thus Visual PROMETHEE could be used for developing decision aid and effective in decision making or prioritizing hydropower options exhibiting quite different features.
机译:尼泊尔需要适当的决策框架来开发巨大的水电潜力。这项工作主要是提出适用于小型水电计划(1至25兆瓦)的决策框架,以帮助确定优先次序。将来,可以开发出一种类似的方法来在广泛的容量范围内确定水电项目的优先级。本文基于多准则方法,其主要目标是开发一种决策支持工具,以评估,比较和排列水电计划的替代方案。拟议的框架根据涉及经济,社会,环境,政治目标的五个目标及其固有的不确定性组织了一系列标准。确定了六个能力相若的尼泊尔试点,以测试决策框架,Visual PROMETHEE(VP)应用程序证明对决策有效。因此,Visual PROMETHEE可用于开发决策辅助工具,并有效地进行决策或确定具有完全不同功能的水电选择的优先级。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号