首页> 外文期刊>International Journal on Hydropower & Dams >Management systems, systems analysis and risk analysis in dam safety
【24h】

Management systems, systems analysis and risk analysis in dam safety

机译:大坝安全管理系统,系统分析和风险分析

获取原文
获取原文并翻译 | 示例
           

摘要

The International Commission on Large Dams, at its Annual Meeting in Lucerne, approved a new Bulletin: Dam Safety Management: Operation Phase of Life Cycle [2011'J, prepared by the Committee on Dam Safety . This Bulletin is devoted primarily to the development and the implementation of a dam safety management system for dams in the operation phase of the life cycle. The Bulletin goes beyond the traditional technical realm of 1COLD Bulletins by providing considerable principles-based guidance on governance and management arrangements, to enable the effective implementation of safety management processes and safety engineering by dam owners. The Bulletin builds on the principles established by ICOLD in Bulletins 59 (Dam Safety), 61 (Dam Design Criteria), and 130 (Risk Assessment in Dam Safety Management).
机译:国际大坝委员会在卢塞恩举行的年度会议上,批准了由大坝安全委员会编写的新公告:大坝安全管理:生命周期的运营阶段[2011'J]。本公告主要致力于在生命周期的运营阶段为大坝开发和实施大坝安全管理系统。该公告超越了1COLD公告的传统技术领域,它为治理和管理安排提供了基于原则的重要指导,从而使大坝所有者能够有效地实施安全管理流程和安全工程。该公告基于ICOLD在第59号公告(大坝安全),第61号公告(大坝设计标准)和第130号公告(大坝安全管理中的风险评估)中确立的原则。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号