This paper describes a probabilistic approach for the adequacy assessment of a distribution system having distribution generator (DG) sets, which are owned and controlled by customers. Markov modeling has been employed to obtain capacity outage table for DG sets. Available capacity of distribution substation has been assumed as continuous random variable. Discrete capacity distribution is added to continuous distribution of substation capacity and merged with hourly peak load for obtaining probability of failure and expected demand not supplied (EDNS) annually with the help of derived closed form relations. The procedure has been illustrated with a case study.
机译:本文介绍了一种概率方法,该方法用于评估具有配电发电机组(DG)的配电系统,该配电发电机组由客户拥有和控制。马尔可夫建模已用于获得DG集的容量中断表。配电变电站的可用容量已假定为连续随机变量。离散容量分布被添加到变电站容量的连续分布中,并与每小时的高峰负荷合并,以在导出的封闭式关系的帮助下,每年获得故障概率和未满足的预期需求(EDNS)。通过案例研究说明了该过程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号