首页> 外文期刊>International Journal of Civil Engineering,Transaction A:Civil Engineering >Critical External Risks in International Joint Ventures for Construction Industry in Pakistan
【24h】

Critical External Risks in International Joint Ventures for Construction Industry in Pakistan

机译:巴基斯坦建筑行业国际合资企业中的严重外部风险

获取原文
获取原文并翻译 | 示例
           

摘要

International joint ventures (IJVs) are both advantageous and challenging due to differing technical abilities, economic and political environments, and cultural and legal frameworks. This study identifies the external risks particularly political, economic, legal, social and environmental in IJVs carrying out construction projects in Pakistan. It further analyzes the impact of these risks on the project success criteria of time, cost and quality. Data are collected using questionnaire-based survey and with the help of factor analysis, 16 critical external risks are identified. The top most critical risks are fluctuation in exchange rate, weather systems, political instability and delay in approval. Analytical Hierarchy Process is applied to prioritize critical external risks discretely for project success criteria. As a result, time is found to be the most influenced project criterion by the critical external risks, followed by cost and quality. The results are of importance for local practitioners in the form of recommendations for better management of IJV risks. Future research can benefit from incorporation of more dimensions of project success.
机译:由于技术能力,经济和政治环境以及文化和法律框架的差异,国际合资企业(IJV)既有利又充满挑战。这项研究确定了在巴基斯坦开展建设项目的合资企业的外部风险,特别是政治,经济,法律,社会和环境风险。它进一步分析了这些风险对项目成功时间,成本和质量标准的影响。使用基于问卷的调查收集数据,并借助因素分析来识别16个关键外部风险。最严重的风险是汇率波动,天气系统,政治不稳定和审批延迟。运用层次分析法为项目成功标准离散地确定关键外部风险的优先级。结果,时间是受关键外部风险影响最大的项目标准,其次是成本和质量。这些结果对当地从业者具有重要意义,其建议形式为更好地控制IJV风险。未来的研究可以从项目成功的更多方面中受益。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号