首页> 外文期刊>The International Journal of Advanced Manufacturing Technology >An integrated approach to solve tool-part grouping, job allocation and scheduling problems in a flexible manufacturing system
【24h】

An integrated approach to solve tool-part grouping, job allocation and scheduling problems in a flexible manufacturing system

机译:解决柔性制造系统中工具零件分组,作业分配和计划安排问题的集成方法

获取原文
获取原文并翻译 | 示例
       

摘要

An integrated approach is discussed in this article to solve the sub-problems like tool-part grouping, job allocation on machines and minimization of make-span in a FMS. Tool and part grouping is performed using “principal component analysis”, and tool allocation has been carried out using priority-based approach by developing a potency index. Thereafter, the concept has evolved based on threshold machining time, minimum operation time, and maximum possible operation time to minimize the make-span of the system. In order to validate the result “analysis of variance” has been employed, and on a simulated example the F ratio is enumerated.
机译:本文讨论了一种集成方法,以解决子问题,例如工具部件分组,机器上的作业分配以及FMS中的制造跨度最小化。使用“主要成分分析”执行工具和零件分组,并且通过开发效能指数使用基于优先级的方法进行工具分配。此后,该概念基于阈值加工时间,最小操作时间和最大可能操作时间而发展,以最大程度地减少系统的制造时间。为了验证结果,采用了“方差分析”,并在一个模拟示例中列举了F比。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号