首页> 外文期刊>Interlending & document supply >An information integration approach for waiting room management in high speed railway stations
【24h】

An information integration approach for waiting room management in high speed railway stations

机译:高速火车站候车室管理的信息集成方法

获取原文
获取原文并翻译 | 示例
           

摘要

PurposenThis paper aims to propose a systematic approach to facilitate passenger flow in high speed rail (HSR) stations. A case study is conducted to validate the approach.nDesign/methodology/approachnThis paper argues that HSR station management consists of train management, station capacity management, waiting room management and passenger flow management, and that two-way and dynamic information exchange exists among the components. Accordingly, the proposed approach integrates the components in HSR station management based on information exchange and heuristic algorithms. A HSR station in China with four regular waiting rooms, one mother-and-infant waiting room and one VIP waiting room located on two floors are chosen for a case study. An arrangement plan for waiting zones and waiting rooms is generated by following the proposed approach.nFindingsnThe result of the case study indicates that the proposed approach is capable of arranging waiting zones and waiting rooms quickly and effectively to maximize utilization of waiting room capacity and to minimize passenger walking distance from waiting rooms to platforms.nResearch limitations/implicationsnThe management problem of railway station waiting room also relates to some other factors such as platforms, tracks adjustment and delay of the trains. As an emerging technology, the Internet of Things (IoT) is expected to offer promising solutions to transform the operation and role of many existing industrial systems such as transportation systems including railway systems. The future study of the authors will focus on IoT intelligent railway management system.nPractical implicationsnThe result indicates that the proposed method is an effective solution to the management of railway station waiting room, which can be applied to railway station management system.nSocial implicationsnChina Railway System provides service to billions of passengers. This research has significant social-economic impacts.nOriginality/valuenThis paper fulfills an information integrated approach for improving waiting room management in high speed railway stations and a case study testing the approach.
机译:目的本文旨在提出一种系统的方法来促进高铁(HSR)站中的乘客流量。 n设计/方法/方法本文认为高铁车站管理包括列车管理,车站容量管理,候车室管理和旅客流量管理,并且高铁车站之间存在双向和动态信息交换。组件。因此,所提出的方法基于信息交换和启发式算法将高铁车站管理中的组件集成在一起。案例研究选择了一个中国高铁站,该站有四个常规候诊室,一个母婴候诊室和一个位于两层的VIP候诊室。按照建议的方法生成了等候区和候车室的布置计划。n研究结果表明,该建议方法能够快速有效地布置等候区和候车室,从而最大程度地利用等候室的容量并最大程度地减少候车室的容量。乘客从候车室到月台的步行距离。n研究局限/意义n火车站候车室的管理问题还与月台,轨道调整和火车延误等其他因素有关。物联网(IoT)作为一种新兴技术,有望提供有前途的解决方案,以改变许多现有工业系统(例如包括铁路系统在内的运输系统)的运行和作用。作者的未来研究将集中在物联网智能铁路管理系统上。n实践意义n结果表明,该方法是对火车站候车室管理的有效解决方案,可应用于火车站管理系统。为数十亿乘客提供服务。这项研究具有重大的社会经济影响。原创性/价值本文完成了一种信息集成方法,以改善高速铁路车站的候车室管理,并通过案例研究对该方法进行了测试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号