首页> 外文期刊>Inside FERC >Mulling transfer of wave project license to tribe, Finavera seeks deadline extension
【24h】

Mulling transfer of wave project license to tribe, Finavera seeks deadline extension

机译:正在考虑将Wave项目许可转让给部落,Finavera寻求延长期限

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The developer of the only licensed offshore wave energy pilot project in the US has asked FERC for an extension of time to reach a lease agreement with a local Indian tribe. Finavera Renewables Ocean Energy said it needs more time because it is considering transferring the license for the Makah Bay project (P-12751) to the Makah Indian Tribe.rn"Obviously, this aspect of the negotiations presents issues that must be fully evaluated by both Finavera and the Tribe, requiring further investigation," said the August 28 filing. Finavera wants FERC to extend until October 22, the missed August 22 deadline for reaching a lease agreement.
机译:美国唯一获得许可的海上波浪能试验项目的开发商已要求FERC延长与当地印度部落达成租赁协议的时间。 Finavera Renewables Ocean Energy表示,它需要更多时间,因为它正在考虑将Makah Bay项目(P-12751)的许可证转让给Makah IndianTribe。rn“显然,谈判的这一方面提出了必须由双方双方充分评估的问题Finavera和部落需要进一步调查。” 8月28日的文件说。 Finavera希望FERC延长至10月22日,也就是8月22日错过的达成租赁协议的最后期限。

著录项

  • 来源
    《Inside FERC》 |2008年第8期|14|共1页
  • 作者

    Esther Whieldon;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号