...
首页> 外文期刊>Inside FERC >Regency plans major expansion of system to move increased Haynesville Shale output
【24h】

Regency plans major expansion of system to move increased Haynesville Shale output

机译:Regency计划大规模扩展系统,以增加Haynesville页岩的产量

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

A $1.1 billion expansion of the Regency Intrastate Gas System in northern Louisiana should provide approximately 1.45 Bcf/d of new capacity to move gas produced from the Haynesville Shale to market areas, owner Regency Energy Partners said Tuesday.rnRIGS, which currently has capacity of 910,000 Mcf/d, covers 320 miles running from Caddo Parish to Franklin Parish. The two-phase expansion, subject to customary regulatory approvals, will loop the existing pipeline, extend the system southwest into Desoto Parish and add new compression.rnThe first phase, set for completion in the first half of next year, will add 300,000 Mcf/d of capacity once fully operational at a cost of about $375 million. The second phase, targeted for completion by the end of 2009 and fully operational in early 2010, will add an incremental 1.15 Bcf/d.rnIn total, the expansion will add 204 miles of pipeline ranging in diameter from 24 inches to 42 inches, as well as 49,000 horsepower of compression, Regency said.
机译:拥有者摄政能源合作伙伴周二表示,路易斯安那州北部摄政州内天然气系统的11亿美元扩建将提供约1.45 Bcf / d的新产能,将海恩斯维尔页岩生产的天然气运至市场区域。rnRIGS目前的产能为910,000 Mcf / d,从Caddo Parish到Franklin Parish长达320英里。该分两阶段进行的扩建工程将获得现有法规的批准,将使现有管道循环,将系统向西南延伸至Desoto Parish,并增加新的压缩技术。第一阶段将于明年上半年完成,届时将增加300,000 Mcf / d。一旦全面投入运营,将耗资约3.75亿美元。第二阶段计划于2009年底完成并于2010年初全面投入运营,届时将增加1.15 Bcf / d.rn总的来说,扩建工程将增加204英里的管道,直径从24英寸到42英寸不等。摄政说,以及49,000马力的压缩。

著录项

  • 来源
    《Inside FERC》 |2008年第15期|12|共1页
  • 作者

    Melanie Tatutn;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号