...
首页> 外文期刊>Inside FERC >Commission accepts Ruby’s rate proposal to encourage long-term transportation contracts
【24h】

Commission accepts Ruby’s rate proposal to encourage long-term transportation contracts

机译:欧盟委员会接受Ruby的价目表,以鼓励长期运输合同

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The commission last week granted a request by Ruby Pipelinento charge short-term customers more to move gas during periods ofnpeak demand. The rate change for short-term firm and interruptiblenservices will remove a bias favoring short-term shippers and encouragenthem to sign up for long-term contracts, Ruby said.nLast year, FERC authorized (CP09-54) Ruby to build and operatenits 675-mile pipeline between Opal, Wyoming and Malin, Oregonn(IF, 12 April ‘10, 12). The system is designed to transport up to 1.5nmillion Dt/d. Ruby has 14 contracts for firm transportation accountingnfor about 1.1 million Dt/d, leaving some capacity available fornshort-term contracts
机译:上周,欧盟委员会批准了Ruby Pipelinen的一项要求,即向短期客户收取更多费用,以在需求高峰时运送天然气。 Ruby表示,短期公司和可中断服务的费率变化将消除偏向短期托运人的偏见,并鼓励他们签署长期合同。n去年,FERC批准(CP09-54)Ruby建造并运营675-怀俄明州蛋白石和俄勒冈州马林之间的英里管道(IF,2010年4月12日,12日)。该系统设计用于传输高达150纳米Dt / d。 Ruby拥有14笔用于企业运输核算的合同n约为110万Dt / d,为短期合同留有一些可用容量

著录项

  • 来源
    《Inside FERC》 |2011年第0425期|p.15|共1页
  • 作者

    Kate Winston;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号