首页> 外文期刊>Inside FERC >In rate case, CPUC orders PG&E to file twiceyearly safety reports after San Bruno blast
【24h】

In rate case, CPUC orders PG&E to file twiceyearly safety reports after San Bruno blast

机译:在费用方面,CPUC命令PG&E在圣布鲁诺爆炸后每年提交两次安全报告

获取原文
获取原文并翻译 | 示例

摘要

California regulators last week ordered Pacific Gas andnElectric to file safety reports twice a year as part of a rate casenregarding the utility’s gas transmission and storage facilities.nThe California Public Utilities Commission adopted PG&E’snGas Accord V settlement resolving revenue requirements, costnallocation and rates for the facilities from 2011 through 2014.nMonthly bills for all customers will rise less than 1% as a result.nThe CPUC added a safety phase to the proceeding followingnthe fatal explosion of a PG&E transmission line in SannBruno, California, in September (IF 20 Sept, 5). The semiannualnsafety reports must provide details on pipeline-relatednand storage safety, reliability and integrity, as well as capitalnprojects and maintenance — and track the amount of moneynspent on such initiatives
机译:加州监管机构上周命令太平洋天然气公司和nElectric公司每年两次提交安全报告,作为对该公用事业的天然气输送和存储设施收费的一部分。设施从2011年到2014年。n结果,所有客户的月费将上涨不到1%。nCPUC在9月加利福尼亚州SannBruno的PG&E传输线发生致命爆炸后(9月20日, 5)。半年度安全报告必须提供与管道相关的和储存安全性,可靠性和完整性以及资本项目和维护的详细信息,并跟踪在此类计划上花费的资金

著录项

  • 来源
    《Inside FERC》 |2011年第0418期|p.22|共1页
  • 作者

    Stephanie Seay;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号