首页> 外文期刊>Inside FERC >In Senate hearing, Clark, Norris questioned on LNG, EPA, transmission siting ...from page 1
【24h】

In Senate hearing, Clark, Norris questioned on LNG, EPA, transmission siting ...from page 1

机译:在参议院听证会上,诺里斯·克拉克(Clark)和诺里斯(Norris)对液化天然气(LNG),环保局(EPA)的传输选址进行了质询...从第1页开始

获取原文
获取原文并翻译 | 示例
           

摘要

Clark underscored the scope of his work in North Dakotanand at NARUC. “Today, North Dakota is amongst the top 10nwind energy producing states, with approximately 1,400 MW ofncapacity. We have sited, or are in the process of siting, hundredsnof miles of new electric transmission lines,” he said. “Hundredsnof millions of dollars have been invested in oil and gas pipelinesnand processing infrastructure.” Clark also noted his involvementnin state proceedings for $6 billion in energy projects.
机译:Clark强调了他在NARUC在北达科他南德市的工作范围。 “如今,北达科他州已跻身风能发电十大州之列,其发电能力约为1400兆瓦。我们已经或正在选址数百英里的新电力传输线。”他说。 “数亿美元投资在石油和天然气管道以及加工基础设施上。”克拉克还指出,他参与了涉及60亿美元能源项目的国家诉讼。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号