...
首页> 外文期刊>Platts Inside FERC >Murkowski bemoans delays in LNG permits,weighs need for pipe permit legislation
【24h】

Murkowski bemoans delays in LNG permits,weighs need for pipe permit legislation

机译:默科夫斯基抱怨液化天然气许可证的延误,使对管道许可证立法的需求过重

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The top Republican on the Senate Committee on Energy andnNatural Resources last week reiterated concerns about the speed ofnliquefied natural gas export permitting decisions, but provided fewnclues about gas-related legislation that may come out of the panel.n“The administration took 29 months to approve a secondnexport facility. I think that is a bit much — there really is a narrownwindow,” Senator Lisa Murkowski, Republican-Alaska, saidnJuly 16 at a Washington energy event sponsored by law firmnDentons and consulting firm Navigant.
机译:参议院能源与自然资源委员会最高共和党议员上周重申了对液化天然气出口许可决定速度的担忧,但很少提供可能涉及专家小组的与天然气有关的立法。n“政府花费了29个月的时间来批准第二出口设施。我认为那有点多-确实有一个狭窄的窗口,”共和党-阿拉斯加参议员Lisa Murkowski在7月16日举行的华盛顿能源活动中说,该活动由律师事务所Denton和咨询公司Navigant赞助。

著录项

  • 来源
    《Platts Inside FERC》 |2013年第0722期|1-1|共1页
  • 作者

    Kate Winston;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号