首页> 外文期刊>Inside FERC >PHMSA moves ahead with gas storage rule as industry questions compliance timeline
【24h】

PHMSA moves ahead with gas storage rule as industry questions compliance timeline

机译:随着行业质疑合规时间表,PHMSA推进了储气规则

获取原文
获取原文并翻译 | 示例
           

摘要

The Pipeline and Hazardous Materials Safety Administration last weekrnreleased an interim final rule on underground natural gas storagernfacilities, calling the measure a first step in addressing critical safetyrnissues in the wake of federal legislation calling for minimum standards.rnThe statutory mandate, included in the PIPES Act earlier this year,rnfollowed the 2015 leak at the Aliso Canyon storage facility in Californiarnthat resulted in the release of an estimated 4.6 Bcf of natural gas.
机译:上周,管道和危险材料安全管理局发布了关于地下天然气存储设施的临时最终规则。在联邦立法要求最低标准之后,该措施是解决关键安全问题的第一步。今年是2015年加利福尼亚州阿里索峡谷(Aliso Canyon)储存设施的泄漏之后,该泄漏导致估计4.6 Bcf的天然气释放。

著录项

  • 来源
    《Inside FERC》 |2016年第1219期|16-17|共2页
  • 作者

    Maya Weber;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号