...
首页> 外文期刊>Inside FERC >FERC rejects California power plant complaint for failing to demonstrate compensation needs
【24h】

FERC rejects California power plant complaint for failing to demonstrate compensation needs

机译:FERC因未能证明赔偿需求而拒绝加利福尼亚电厂的投诉

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

In a move that could affect California’s power markets, FERC hasrnrejected a call for a reliability must-run contract or similar arrangementrnthat would increase a struggling power plant’s revenue.rnAt issue is a June complaint by the owner of the La Paloma powerrnplant who argued that Cal-ISO is forcing the 965 MW plant to operaterneven though it is losing money (EL16-88). Cal-ISO rejected requestsrnfrom the generator that it be allowed to temporarily shutter its units forrneconomic reasons. La Paloma, owned by Rockland Capital, contendsrnthat Cal-ISO’s actions are a regulatory taking, a legal term describing arnregulation that deprives an owner the value of its property.
机译:为了影响加利福尼亚的电力市场,FERC拒绝了一项必须执行的可靠性合同或类似安排的呼吁,这将增加陷入困境的电厂的收入。问题是La Paloma电厂的所有者在6月提出的投诉,他辩称Cal -ISO正在迫使965兆瓦电厂运转,即使它正在亏损(EL16-88)。 Cal-ISO拒绝了发电机的要求,出于经济原因允许其暂时关闭其设备。罗克兰资本公司(Rockland Capital)拥有的La Paloma认为,加州国际标准化组织(Cal-ISO)的行为是一项监管行为,一个法律术语描述了监管失范,剥夺了所有者的财产价值。

著录项

  • 来源
    《Inside FERC》 |2016年第1010期|7-7|共1页
  • 作者

    Ethan Howland;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号