...
首页> 外文期刊>Inside FERC >NEPOOL panel OKs capacity demand curve to be phased in over three years
【24h】

NEPOOL panel OKs capacity demand curve to be phased in over three years

机译:NEPOOL小组确定将在三年内分阶段逐步实现容量需求曲线

获取原文
获取原文并翻译 | 示例

摘要

ISO New England stakeholders on April 8 approved a transitionalrnsloped demand curve proposal for its next capacity auction that wasrnamended to address market monitor concerns that the transitionalrncurve might “delay, not smooth” the market’s alteration.rnISO-NE faces a FERC deadline on April 15 to submit tariff changesrnfor a sloped demand curve for constrained zones in time for its 11thrnForward Capacity Auction, which would cover the period from June 1,rn2020, to May 31, 2021.
机译:ISO新英格兰ISO利益相关者于4月8日批准了其下一次产能拍卖的过渡曲线需求曲线提案,该提案旨在应对市场监测者对过渡曲线可能“延迟而不是平滑”市场变化的担忧。ISO-NE将于4月15日至FERC截止在11thnForward Capacity拍卖中及时提交约束区域倾斜需求曲线的关税变化,该拍卖将涵盖2020年6月1日至2021年5月31日。

著录项

  • 来源
    《Inside FERC 》 |2016年第0418期| 14-15| 共2页
  • 作者

    Mark Watson;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号