...
首页> 外文期刊>Inside FERC >As winter heating season looms, Northeast gas pipeline projects gear up for service
【24h】

As winter heating season looms, Northeast gas pipeline projects gear up for service

机译:随着冬季供暖季节的临近,东北天然气管道项目准备服务

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

With November 1 just days away, requests to begin service have been filed on several US Northeast major pipeline expansions, though certain other projects targeting service in the coming days have been notably absent so far, signaling a potential delay. The largest set of projects scheduled to enter service on November 1 this year are TransCanada’s 1.5 Bcf/d Leach XPress (CP15-514) project, on Columbia Gas Transmission, and the associated 621 MMcf/d Rayne XPress project (CP15-539), on Columbia Gulf Transmission. The 1.5 Bcf/d of producer-backed takeaway capacity on Leach XPress is designed to support substantial new production growth in Ohio and West Virginia, while Rayne XPress would expand north-to-south flows along the Columbia Gulf system, transporting US Northeast shale gas to markets along the Gulf Coast region.
机译:距11月1日仅几天的路程,已经开始要求对美国东北部的几条主要管道进行扩建,尽管到目前为止,针对未来几天的某些其他针对该服务的项目却明显缺席,这表明潜在的延误。计划于今年11月1日投入服务的最大项目是TransCanada的1.5 Bcf / d Leach XPress(CP15-514)项目(位于哥伦比亚天然气输送公司)和相关的621 MMcf / d Rayne XPress项目(CP15-539),在哥伦比亚海湾传输。 Leach XPress上由生产商支持的1.5 Bcf / d的生产商支持外卖能力旨在支持俄亥俄州和西弗吉尼亚州的实质性新产量增长,而Rayne XPress将扩大哥伦比亚湾系统的南北向流量,从而输送美国东北页岩气到墨西哥湾沿岸地区的市场。

著录项

  • 来源
    《Inside FERC》 |2017年第30期|21-21|共1页
  • 作者

    Eric Brooks;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号