首页> 外文期刊>Inside FERC >With standing in question, Sierra Club seeks to drop litigation against NEXUS
【24h】

With standing in question, Sierra Club seeks to drop litigation against NEXUS

机译:由于存在争议,Sierra Club寻求放弃对NEXUS的诉讼

获取原文
获取原文并翻译 | 示例
       

摘要

Environmental groups are seeking to withdraw their litigation challenging federal approval of the NEXUS Gas Transmission project because a landowner who would have provided legal standing for the court challenge sold his property to the pipeline developer. The 1.5 Bcf/d project will consist of 256.6 miles of 36-inch-diameter greenfield pipeline and four new compressor stations through the Midwest. NEXUS began construction in mid-October and has targeted a late third-quarter 2018 in-service date. The project was among several interstate natural gas pipeline projects recently facing emergency stay attempts in federal appeals court.
机译:环保组织正在寻求撤回对NEXUS天然气传输项目获得联邦批准的诉讼,因为原本会为法庭诉讼提供法律地位的地主将其财产卖给了管道开发商。这个1.5 Bcf / d的项目将包括256.6英里,直径为36英寸的新建管道和四个通过中西部的新压缩机站。 NEXUS于10月中旬开始建设,目标是在2018年第三季度末投入服务。该项目是最近在联邦上诉法院面临紧急中止尝试的几个州际天然气管道项目之一。

著录项

  • 来源
    《Inside FERC》 |2017年第27期|111-12|共3页
  • 作者

    Maya Weber;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:30:19

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号