...
首页> 外文期刊>Inside FERC >Producer guidance on 2017 growth falls short of pipeline expansion capacity
【24h】

Producer guidance on 2017 growth falls short of pipeline expansion capacity

机译:生产商对2017年增长的指导未达到管道扩张能力

获取原文
获取原文并翻译 | 示例
           

摘要

An analysis of 2017 guidance for major Northeast producersrnindicates a shortfall between planned production growth andrncontracted pipeline capacity held by those producers on upcomingrnexpansion projects.rnThe shortfall suggests new expansions are unlikely to be filled withrnnew production, but rather will follow a pattern similar to thernexperience of Rockies Express’s Zone 3 Capacity Enhancementrnproject, whereby existing production is rerouted to the expansionrncapacity. Such a phenomenon, should it play out, will be supportive ofrnbasis strengthening at Northeast supply hubs, such as Dominion Southrnand Texas Eastern Transmission M2.
机译:对2017年东北主要生产商的指导意见的分析表明,计划的生产增长与这些生产商在即将进行的扩建项目中持有的合同管道能力之间存在短缺.rn短缺表明新的扩张不太可能充满新的生产,而是会遵循类似于洛矶山脉经验的模式Express的3区容量增强项目,从而将现有生产转移到扩展能力上。这种现象一旦发生,将支持东北供应中心的基础加强,例如Dominion Southrn和德克萨斯东部传输M2。

著录项

  • 来源
    《Inside FERC》 |2017年第20期|1-3|共3页
  • 作者

    Elizabeth McFarland;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号