...
首页> 外文期刊>Inside FERC >Texas Eastern urges FERC to reject call to weigh shipper finances in project approvals
【24h】

Texas Eastern urges FERC to reject call to weigh shipper finances in project approvals

机译:德州东方敦促FERC拒绝在项目审批中权衡托运人财务的要求

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Texas Eastern Transmission late last month pushed back against anrneffort by existing customers to have FERC look into the financialrnstability of the sole shipper on the proposed Stratton Ridge project.rn“The protest effectively requests that the commission change itsrnwell-established policy in two key areas for evaluating proposedrnprojects without providing appropriate support or justification for suchrna change in the policy or its application,” Texas Eastern said.
机译:上个月末,得克萨斯东部传输公司(Texas Eastern Transmission)推迟了现有客户的努力,要求FERC研究拟议的Stratton Ridge项目中唯一托运人的财务稳定性。“抗议活动实际上要求委员会在两个关键领域改变其既定政策德州东方说:“在评估提议的项目时,没有为政策或其应用的此类变更提供适当的支持或理由。”

著录项

  • 来源
    《Inside FERC》 |2017年第3期|25-25|共1页
  • 作者

    Kate Winston;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号