...
首页> 外文期刊>Inside FERC >FERC preapproves future spare parts sales aimed at restoring grid after disasters
【24h】

FERC preapproves future spare parts sales aimed at restoring grid after disasters

机译:FERC预先批准了未来的备件销售,目的是在灾难发生后恢复电网

获取原文
获取原文并翻译 | 示例
           

摘要

In a move intended to enhance grid resilience, FERC has granted priorrnauthorization for a group of utilities to make bilateral transfers ofrnelectric transformers and other critical transmission-related equipmentrnin the event of a catastrophic emergency or other natural disaster.rnThe utilities are parties to the Regional Equipment Sharing forrnTransmission Outage Restoration (RESTORE) agreement intended torncoordinate mutual assistance during response and recovery efforts tornswiftly restore reliable grid operations.
机译:为了增强电网的弹性,FERC授予了一些公用事业公司事前授权,以在发生灾难性紧急事件或其他自然灾害时进行电力变压器和其他重要的与传输有关的设备的双边转移。共享受损的传输中断恢复(RESTORE)协议旨在在响应和恢复工作期间协调互助,以迅速恢复可靠的电网运行。

著录项

  • 来源
    《Inside FERC》 |2018年第9期|6-7|共2页
  • 作者

    Jasmin Melvin;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号