...
首页> 外文期刊>Inside FERC >Cal-ISO aims to ease Powerex EIM limitations caused by market power mitigation
【24h】

Cal-ISO aims to ease Powerex EIM limitations caused by market power mitigation

机译:Cal-ISO旨在缓解因市场力量减弱而导致的Powerex EIM限制

获取原文
获取原文并翻译 | 示例
           

摘要

Powerex’s participation in the Western Energy Imbalance Market has been limited by an unexpected consequence of the way California Independent System Operator mitigates potential market power. Powerex, BC Hydro’s trading arm, started participating in the EIM on April 4, but is limiting its exports into the market to avoid being forced to sell at a bid price that doesn’t reflect its opportunity costs, Cal-ISO said in a waiver request filed April 10 at FERC (ER18-1339). Based in Vancouver, British Columbia, BC Hydro owns 11,869 MW of hydroelectric generation. Powerex, the first Canadian entity to join the EIM, participates by aggregating BC Hydro’s generating assets.
机译:由于加州独立系统运营商减轻潜在市场势力的出乎意料的结果,Powerex参与西方能源不平衡市场受到了限制。 Cal-ISO在豁免中表示,BC Hydro的交易部门Powerex自4月4日开始参加EIM,但为限制其向市场的出口,以避免被迫以不反映其机会成本的出价进行出售。请求于4月10日提交给FERC(ER18-1339)。 BC Hydro总部位于不列颠哥伦比亚省温哥华,拥有11869兆瓦的水力发电设备。 Powerex是加拿大第一个加入EIM的实体,通过汇总BC Hydro的发电资产来参与。

著录项

  • 来源
    《Inside FERC》 |2018年第16期|12-13|共2页
  • 作者

    Ethan Howland;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号