...
首页> 外文期刊>Inside FERC >With certificate expiring soon, PennEast tells FERC it has stopped pursuing project
【24h】

With certificate expiring soon, PennEast tells FERC it has stopped pursuing project

机译:凭借证书即将到期,便士告诉FERC已停止追求项目

获取原文
获取原文并翻译 | 示例
           

摘要

PennEast Pipeline has reaffirmed to the Federal Energy RegulatoryCommission that it is no longer pursuing the natural gas pipelineproject after the commission sought further clarity about the projectsponsors’ intent.The 116-mile, 1.1 Bcf/d project would have linked Marcellus Shale drygas production with markets in Pennsylvania, New Jersey and NewYork but struggled to obtain wetlands and water quality permits in NewJersey and faced ongoing opposition from environmental groups.
机译:宾夕法尼亚队重申了联邦能源监管 委托,它不再追求天然气管道 委员会寻求进一步清楚项目后的项目 赞助者的意图。 116英里,1.1 BCF / D项目将连接Marcellus Sale Dry 天然气生产与宾夕法尼亚州,新泽西州和新的市场 约克,但努力获得新的湿地和水质许可证 泽西岛面临着环境团体的持续反对。

著录项

  • 来源
    《Inside FERC》 |2021年第6期|16-16|共1页
  • 作者

    Maya Weber;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号