首页> 外文期刊>Inside FERC >FERC Democrats say PJM is back on course with latest capacity market overhaul
【24h】

FERC Democrats say PJM is back on course with latest capacity market overhaul

机译:FERC MODELATS说PJM又回到了最新的能力市场大修的过程中

获取原文
获取原文并翻译 | 示例

摘要

Three of four Federal Energy Regulatory Commission members — Chairman Richard Glick and Commissioners Allison Clements and Mark Christie — agree that PJM Interconnection must abandon a previous capacity market overhaul aimed at blunting the effect of state-level clean energy subsidies. The commissioners made their opinions known in Oct. 19 statements, required under a special section of the Federal Power Act, after a PJM replacement proposal (ER21-2582) to accommodate statesubsidized clean energy resources went into effect by operation of law on Sept. 28 following a 2-2 commission deadlock.
机译:四个联邦能源监管委员会成员中有三位 - 理查德光明和专员艾莉森Clements和Mark Christie - 同意PJM互连必须放弃以往的能力市场大修,旨在淘汰状态级清洁能源补贴的效果。 专员提出了10月19日所知的意见,根据“联邦权力法”的特殊部分所需的陈述,在PJM替换提案(ER21-2582)以适应美国法律化的清洁能源资源,并于9月28日经营生效。28日 在2比2委员会僵局之后。

著录项

  • 来源
    《Inside FERC》 |2021年第25期|3-4|共2页
  • 作者

    Zack Hale;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号