...
首页> 外文期刊>Inside FERC >Changing policy climate prompts stop-gap, long-range midstream gas adaptations
【24h】

Changing policy climate prompts stop-gap, long-range midstream gas adaptations

机译:改变政策气候促使停止差距,远程中游气体适应

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Natural gas pipeline company executives described both stopgap steps to help keep infrastructure projects afloat in a challenging Northeast US permitting environment, alongside growing efforts to adapt their businesses to a lower carbon energy future. Speaking at the LDC Northeast Gas Forum July 20, Dean Holden, business development manager for Chesapeake Utilities, acknowledged longer permitting timelines and opposition to projects in some quarters, but said the company has recently used virtual pipeline capabilities enabled by affiliate Marlin Gas Services to help bridge the gap.
机译:天然气管道公司高管介绍了STOPGAP措施,帮助保持基础设施项目在挑战美国允许环境挑战的挑战中,同时努力使其业务适应较低的碳源未来。 在第20季度LDC东北天然气论坛上发表演讲,Chesapeake公用事业的业务发展经理Dean Holden,承认了一些允许的时间和反对在某些季度的项目,但表示该公司最近使用了联盟Marlin Gas Services的虚拟管道能力来帮助 弥合差距。

著录项

  • 来源
    《Inside FERC》 |2021年第26期|18-19|共2页
  • 作者

    Maya Weber;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号