...
首页> 外文期刊>Inside FERC >Glick derides decision sparing hydro project licensee from responsibility over flooding
【24h】

Glick derides decision sparing hydro project licensee from responsibility over flooding

机译:GLICK DRISTE DICTION SPARO PELICE PELICTO PELICE PELINGE OF COLUCTING

获取原文
获取原文并翻译 | 示例

摘要

Federal Energy Regulatory Commission member Richard Glick blasted commission staff's denial of a hydropower project complaint as flippant and asserted such decisions should not be delegated to staff. The complaint, filed in December 2018 by the City of Miami, Oklahoma, sought to force the Grand River Dam Authority to acquire 13,000 acres of land in and around the city that has repeatedly flooded since the commission licensed GRDA to operate the 105.18 MW Pensacola Hydroelectric Project (P-1494) in 1992.
机译:联邦能源监管委员会成员Richard Glick Blasted委员会员工拒绝水电项目投诉作为轻浮,并声称这些决定不应授予员工。奥克拉荷马州迈阿密市12月提交的投诉试图迫使大河大坝管理局在委员会授权GRDA经营105.18 MW Pensacola水电之后一再淹没的城市和周围地区的13,000英亩的土地。项目(P-1494)于1992年。

著录项

  • 来源
    《Inside FERC 》 |2020年第21期| 4-5| 共2页
  • 作者

    Jasmin Melvin;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号