...
首页> 外文期刊>Inside FERC >Golden Pass amends FERC pipe project application to adjust gas supply sources
【24h】

Golden Pass amends FERC pipe project application to adjust gas supply sources

机译:Golden Pass修改了Ferc管道项目应用,以调整气体供应源

获取原文
获取原文并翻译 | 示例

摘要

Golden Pass Pipeline is again seeking to shift the location of a proposed compressor station and make other changes to the 69-mile, 2.5 Bcf/d natural gas pipeline project to reflect evolving upstream supply arrangements needed to serve the Golden Pass LNG terminal in Texas. The abbreviated amendment, proposed to the Federal Energy Regulatory Commission Oct. 2 (CP21-1), would remove Kinder Morgan's Tennessee Gas Pipeline as an input source and establish a new connection with a proposed interstate pipeline to be built and operated by Energy Midstream Partners' Enable Gulf Run Transmission.
机译:Golden Pass Pipeline再次试图将建议的压缩机站的位置转移到69英里,2.5 BCF / D天然气管道项目的其他变化,以反映在德克萨斯州金牌液化天液终端所需的上游供应安排。向联邦能源监管委员会提出的缩写修正案2月2日(CP21-1),将删除Kinder Morgan的田纳西州天然气管道作为输入来源,并建立与拟议的州际管道建立和运营的新联系,以由能源中游合作伙伴建造和运营'启用海湾运行传输。

著录项

  • 来源
    《Inside FERC》 |2020年第12期|19-19|共1页
  • 作者

    Maya Weber;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号