首页> 外文期刊>Inside FERC >NextEra outlines MVP delays if ruling striking Army Corps NWP 12 stands
【24h】

NextEra outlines MVP delays if ruling striking Army Corps NWP 12 stands

机译:如果统治着引导陆军军团NWP 12代表,Nextera概述了MVP延迟

获取原文
获取原文并翻译 | 示例
           

摘要

NextEra Energy has warned the US Supreme Court that the 303-mile, 2Bcf/d Mountain Valley Pipeline could face a 15-month delay incompleting construction if a district court ruling is allowed to standundermining the US Army Corps of Engineers’ nationwide permit 12, akey water crossing permit.NextEra’s friend of the court filing June 26 came as multiple oil andgas industry groups have supported the Army Corps’ effort convince USSupreme Court to grant a stay pending appeal in the 9th Circuit of thenationwide injunction by US District Court for the District of Montana.
机译:Nextera Energy已经警告美国最高法院,303英里,2BCF / D山谷管道可能面临15个月的延迟完成建筑如果允许区域法院裁决抵抗破坏美国陆军的工程师的全国范围内许可证12,a关键排水许可证。Nextera举行六月二十六日的法院的朋友作为多种石油和天然气产业团队支持陆军军团的努力说服我们最高法院在第9条巡回赛中授予待命申诉美国地区法院为蒙大拿区的全国禁令。

著录项

  • 来源
    《Inside FERC》 |2020年第jul6期|16-17|共2页
  • 作者

    Maya Weber;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号