...
首页> 外文期刊>Inside FERC >Commission plan to revamp transmission project incentives draws mixed reviews
【24h】

Commission plan to revamp transmission project incentives draws mixed reviews

机译:改革传输项目激励措施的佣金计划绘制了混合评论

获取原文
获取原文并翻译 | 示例
           

摘要

The Federal Energy Regulatory Commission on July 1 received a waveof both praise and criticism on a plan to revamp what many industrystakeholders consider to be an out-of-date incentives policy forelectric transmission projects. At issue is a proposed rule released inMarch that would depart from an approach established by FERC morethan a decade ago by focusing on economic and reliability benefitsinstead of risks and challenges that projects face.
机译:7月1日联邦能源监督委员会收到了一波对改造许多行业的计划的赞誉和批评利益攸关方认为是一个过时的激励政策电动传输项目。问题是拟议的规则发布3月将从Ferc More建立的方法离开通过专注于经济和可靠性效益,多年前而不是突出的风险和挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号