...
首页> 外文期刊>Inside FERC >Exelon: Future of four Illinois nuclear plants to be shaped in 2020
【24h】

Exelon: Future of four Illinois nuclear plants to be shaped in 2020

机译:Exelon:四座伊利诺伊州核电站的未来将在2020年建成

获取原文
获取原文并翻译 | 示例

摘要

The first half of 2020 will be a “critical” time for four Exelon nuclearpower plants in Illinois, Exelon President and CEO Chris Crane said onThursday.By then, Exelon expects to have seen an order from the FederalEnergy Regulatory Commission on PJM Interconnection’s proposedcapacity market overhaul and the grid operator’s response, and knowthe outcome of legislation in Illinois that would put the state on a pathto 100% clean energy. The legislation now under discussion could givean economic boost to the company’s nuclear plants in the state.“I can’t stress how important this spring legislative session will befor the future of the four sites that are not covered under the [zeroemissions credit] program,” Crane said on a call to discuss Exelon’sthird-quarter earnings.
机译:Exelon总裁兼首席执行官Chris Crane星期四表示,2020年上半年对于伊利诺伊州的四个Exelon核电站来说是“关键”时刻。届时,Exelon预计将收到联邦能源监管委员会关于PJM Interconnection进行的容量市场大修计划的命令。以及电网运营商的回应,并了解伊利诺伊州的立法成果,这将使该州迈向100%的清洁能源之路。目前正在讨论的立法可能会给公司在该州的核电站带来经济上的推动。“我无法强调,今年春季立法会议对于[零排放信用]计划未涵盖的四个地点的未来有多么重要,克雷恩在电话会议上讨论了Exelon的第三季度收益。

著录项

  • 来源
    《Inside FERC 》 |2019年第4期| 11-11| 共1页
  • 作者

    Kelly Andrejasich;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号